The Challenge
We received a call from one of our architects regarding issues with their lobbies due to a change in fire rating by the surveyor, from Group 3 to Group 1 and 2. This change required modifications to their design intent.


The Solution
After reviewing the drawings, we were able to adjust our designs to meet the new fire rating requirements while maintaining the original design intent. The architect selected one of our veneers with a black core MDF and one of our slat options, AUS Fins/Aus Slats, for the main lobbies over two buildings. The project spanned over 13 levels, with some areas being straightforward and others more intricate, involving doors, different ceiling heights, and lift buttons.
The Outcome
We produced this project during the lockdowns from our Melbourne manufacturing facility and shipped it to Canberra in multiple shipments. Our comprehensive range of fire-rated products in various materials allowed us to provide both decorative and acoustic solutions. The final installation successfully met the fire rating requirements and maintained the aesthetic and functional goals of the project.